Working with Telluric Compensation : Running Telluric Compensation : Using Telluric Compensation in CPDM
   
Using Telluric Compensation in CPDM
When working with test point inspections in a periodic or annual survey that require telluric compensation, use the Telluric workspace in the CPDM Test Point Inspection grid to perform compensation and other related functions.
Test point records associated with the selected pipeline segment display in the Test Point Inspection grid and the Test Point Inspection Detail mini-grid. Test point inspections eligible for telluric compensation display in the Telluric workspace based on your selection of SDL survey files (upstream/downstream data set).
Topics in this section include those in the following list:
Viewing Test Point Inspections Eligible for Compensation
Changing the Compensation Requirement
Running Telluric Compensation
Reversing a Compensation Run for a Selected Survey Date
Uncompensating Test Point Inspections